FigCrafts supports custom plastic model kits, action figures, PVC collectible figures and vinyl toys from product engineering through final pack-out. Review the capabilities, factory scope and project information buyers need before supplier selection.
Manufacturing scope
In-House Manufacturing and Coordinated Support
The project scope is defined clearly so buyers know which work is performed by FigCrafts and which items are supplied by established partners.
Product Development & Production
3D modeling, prototype development, tool design and machining, injection molding, vinyl rotocasting, resin casting, painting, pad printing, hand finishing, assembly, inspection and final pack-out are supported through the FigCrafts workflow.
Printed Packaging Components
Approved boxes, instructions, labels, trays, blisters and specialist inserts are produced by established packaging partners and coordinated by FigCrafts.
Quality & Inspection Support
In-house checkpoints and final inspection can be supplemented by buyer or third-party factory and product inspections when arranged for the project.
Testing & Logistics Coordination
Applicable third-party testing and shipment arrangements are confirmed according to the product, target market, buyer requirements and delivery terms.
Core Manufacturing Capabilities
Select a capability for the process, inputs, outputs and buyer questions relevant to that stage.
01
Create production-ready 3D parts and assemblies from authorized artwork, references, drawings or existing files.
02
Produce physical samples to review form, scale, fit, function, surface and color before production tooling.
03
Design, machine and trial production tooling for approved parts, materials and manufacturing quantities.
04
Produce custom plastic components on 45 servo machines from 80T to 850T, including two rotary two-color machines.
05
Apply approved colors, paint masks, facial details, graphics, hand-painted details and specified surface finishes.
06
Complete product assembly, part-count checks, accessory organization, packaging coordination and final pack-out on-site.
07
Use approved samples and specifications for production checks, final inspection and buyer or third-party inspection support.
Typical project process
From Initial Review to Finished Goods
The exact sequence is adjusted to the product, material, quantity and finish. Each stage is reviewed before the next major production commitment.
01
Project Review
Review authorized artwork, product size, expected quantity, target market, intended use and packaging requirements.
02
Product Engineering
Confirm part breakdown, interfaces, visible surfaces, assembly requirements and the proposed tooling approach.
03
Prototype Approval
Use each prototype to validate the specific appearance, structure, fit, function or finish questions it was built to answer before production tooling.
04
Tooling & Trial Parts
Build production tooling and review trial parts for dimensions, fit, surface quality and required corrections.
05
Production Release
Confirm material, forming conditions, first-article criteria, quantity, SKU split, decoration references and in-process checkpoints before full production.
06
Inspection & Pack-Out
Check appearance, assembly, completeness and packaging before final release and shipment preparation.
Products supported
Capabilities for Different Product Types
Manufacturing requirements vary by finished product. FigCrafts reviews the part structure, material, finish, assembly and packaging needed for each project.
Factory and quality
Factory Scale and Quality Systems
FigCrafts supports supplier evaluation with facility information, equipment details, quality management, audit status and inspection access.
ISO 9001 Quality Management
An ISO 9001-certified quality management system supports documented process control, production checkpoints and continual improvement.
BSCI Audit Status
The manufacturing facility has completed BSCI auditing for buyer review of social responsibility management.
Buyer & Third-Party Inspection
Internal inspection is supported by buyer or third-party factory and product inspections when arranged for the project.
NDA & Tooling Terms
Tooling ownership, storage, maintenance and transfer terms are confirmed in the project agreement before tooling begins. Customer-funded tooling arrangements are documented as part of the approved commercial scope.
Project information
What to Send for an Initial Review
A finished engineering package is not required. Share the available product files together with the intended size, quantity, features, finish, packaging and target market.
View the project file guide ->Frequently asked questions
Manufacturing Capability FAQ
MOQ, manufacturing method, testing and schedule are confirmed from the actual product specification and order requirements.
Related pages
Continue Your Supplier Review
Learn more about FigCrafts, explore supported products, review quality control or prepare the information for your project.
Review the company, facility, manufacturing team and operating scope.
ProductsExplore custom figures, vinyl toys, action figures and plastic model kits.
QualityReview sample approvals, production checkpoints and inspection support.
ContactSend your product requirements and available design files to FigCrafts.
Start a manufacturing project
Discuss Your Product Requirements
Share your authorized artwork, current product stage, target size, quantity, required features, finish, packaging and schedule. Our team can review manufacturability and confirm the information needed for quotation.